Quick Project

As a safety measure, we removed the uneven, rotten, railroad ties that posed as a walk path to the restroom located on Hole #7.  The interior of the path was replaced with a DG product that will alleviate the slipping hazard and a small annual plant bed was added to provide aesthetic balance.  In the future, some additional measures will be taken to "spruce-up" the entire area.







   

No comments:

Post a Comment